Feasibility Study — Laspur Murigram HPP (230 MW)

Location: District Chitral, KPK 

Client: SHYDO (now PEDO)

Duration: Jun 2012 – Dec 2014 

Status: Completed

Description: Feasibility study for a 230 MW peaking hydropower scheme on the Laspur River in Chitral, featuring a diversion weir, a 33.5 km concrete-lined headrace tunnel and an underground cavern powerhouse housing three 44.33 MW Pelton turbine-generator units, projected to generate 560 GWh a year.